Accelerate safety-critical
development with PACT ProSCAPE
One integrated environment for requirements management, traceability, reviews, testing, and certification evidence — so your whole team works from a single, audit-ready source of truth.
Traceability thread
RTM · live- Baselined
SYS-REQ-014
System Requirement
- Reviewed
HLR-021
High-Level Requirement
- Traced
LLR-088
Low-Level Requirement
- Passed
TC-133
Test Case
- Signed
EVD-009
Evidence
100%
Coverage
0
Open items
0
Gaps
Trusted across regulated, safety-critical industries
0+
Safety standards supported
0%
Traceability, generated live
0
Integrated environment
0
Artifact tiers, fully linked
Compliance breaks in the gaps between tools
Most teams stitch certification together from half a dozen systems that never talk to each other. The evidence exists — it just isn't connected.
Before · disconnected
Excel
Requirements & matrices
Word
Plans & reports
Reviews & findings
Git
Source, untraced
SharePoint
Scattered artifacts
Manual trace
Rebuilt every audit
Manual traceability, version drift, findings lost in inboxes, and a week of scramble before every review.
After · PACT ProSCAPE
- Requirements, reviews, source, and tests as one linked graph
- Traceability matrix generated automatically from live links
- Findings, sign-offs, and problem reports kept with the evidence
- Baselined, audit-ready packages available on demand
One thread, from planning to certification
Every stage of a DO-178C or DO-254 program lives in the same connected graph — so the evidence you need at the end is a byproduct of the work, not a last-minute build.
01Planning
PSAC · PHAC · SDP
Stand up plans and standards from current, guidance-aligned templates. Establish the compliance agreement between your team, the customer, and the certification authority before a single requirement is written.
02Requirements
SYS · HLR · LLR · DERIVED
Capture system, high-level, low-level, and derived requirements as first-class linked objects. Every requirement carries its rationale, verification method, and status.
03Reviews
CHECKLIST · SIGN-OFF
Run formal reviews against built-in checklists, capture findings as action items, and close them out with electronic signatures — no email threads, no spreadsheets.
04Implementation
MODULE-DESC
Document design and module descriptions alongside the requirements they satisfy, keeping intent and implementation in the same traceable graph.
05Source Code
SRC · COMMIT
Associate source modules and versions with their requirements and tests so code changes never break the certification thread.
06Testing
TC · TP · RESULT
Author test cases and procedures, record results, and link each verification back to the requirement it proves.
07Traceability
RTM (AUTO)
Generate the Requirements Traceability Matrix automatically. Gaps surface the moment they appear instead of days before an audit.
08Certification
EVIDENCE PACKAGE
Assemble baselined, signed, review-backed evidence into audit-ready packages you can present to customers and authorities on demand.
Everything a certification program needs, in one place
Requirements, reviews, source, tests, problem reports, and evidence — each a first-class object, each linked to the rest.

Project Dashboard
Requirements Management
System, high-level, low-level, and derived requirements live as linked objects with rationale, status, and verification method attached.
- SYS / HLR / LLR tiers
- Derived-requirement tracking
- Attributes & rationale
Hardware & Software Items
Model the hardware and software items that make up your product and hang every requirement, module, and test off the right item.
- HW / SW item hierarchy
- Item-scoped requirements
- Configuration items
Reviews & Checklists
Hold formal reviews against comprehensive built-in checklists, log findings as action items, and drive every one to closure.
- Guidance-based checklists
- Action-item tracking
- Peer & formal reviews
Electronic Signatures
Capture accountable sign-offs on reviews and baselines with attributable, timestamped electronic signatures.
- Attributable sign-off
- Timestamped records
- Role-based authority
Problem Reports
Raise, classify, and manage problem reports against your design and track resolution formally through to closure.
- Formal PR lifecycle
- Impact classification
- Closure evidence
Baselines
Snapshot a consistent, immutable state of any set of artifacts and compare baselines to see exactly what changed and why.
- Immutable snapshots
- Baseline comparison
- Version history
Traceability
Bidirectional links across requirements, design, source, and tests generate a live Requirements Traceability Matrix on demand.
- Automatic RTM
- Bidirectional links
- Gap detection
Source Code & Modules
Attach source modules and module descriptions to the requirements they implement so code and intent stay in sync.
- Module descriptions
- Requirement-to-code links
- Version association
Test Cases & Procedures
Author test cases and procedures, execute and record results, and trace each verification back to its requirement.
- Test authoring
- Result capture
- Verification traceability
Dashboards
Role-aware dashboards give managers, engineers, and quality leads a live read on progress, coverage, and open items.
- Live progress
- Coverage metrics
- Role-aware views
Reports & Document Generation
Produce planning documents, matrices, and compliance reports from live project data — always current, never re-typed.
- One-click reports
- Template library
- Live data export
Users, Roles & Audit History
Role-based access control governs who can do what, while a complete audit history records every change for traceable accountability.
- Role-based access
- Full audit trail
- Accountable changes
Built around the standards you certify to
PACT ProSCAPE guides the compliance activities each framework expects — and keeps the evidence linked to the objectives it satisfies.
Airborne Software
Software Considerations in Airborne Systems
Guide software life-cycle data from planning through verification, with objective-level traceability across DAL A–E.
- Planning artifacts (PSAC, SDP, SVP)
- HLR/LLR capture & trace
- Verification evidence
Airborne Hardware
Design Assurance for Airborne Electronic Hardware
Manage the hardware design-assurance life cycle — requirements, design, validation, and verification — with full artifact control.
- HW requirements & design
- Validation & verification
- Configuration management
Systems
Development of Civil Aircraft & Systems
Trace system-level requirements down to software and hardware items to keep the whole development assurance chain connected.
- System requirements
- SW/HW allocation
- System-level traceability
CNS/ATM Ground
Software Assurance for Ground Systems
Apply the same disciplined requirements, review, and verification workflow to ground-based CNS/ATM software.
- Assurance levels AL1–AL6
- Ground-system artifacts
- Review & verification
Automotive
Road Vehicles — Functional Safety
Manage safety requirements and work products across ASIL A–D with traceable verification and confirmation reviews.
- ASIL-tagged requirements
- Work-product traceability
- Confirmation reviews
Industrial
Functional Safety of E/E/PE Systems
Structure the safety life cycle and SIL-driven verification evidence for programmable electronic safety systems.
- Safety life-cycle phases
- SIL verification
- Evidence management
Railway
Railway Software for Control & Protection
Cover software SIL requirements, reviews, and verification for railway control and protection systems.
- Railway SIL levels
- Verification & validation
- Reviewer independence
Process
Automotive SPICE Process Assessment
Give assessors the bidirectional traceability and consistency evidence that VDA-scope process assessments expect.
- Bidirectional traceability
- Consistency evidence
- Work-product mapping
One discipline, every safety-critical domain
The frameworks differ; the need for connected, provable evidence does not. PACT ProSCAPE adapts to how your industry certifies.
Aerospace
Airborne software & hardware, audit-ready
Run DO-178C and DO-254 programs end to end, from planning templates to signed evidence packages your DER and the authority can review with confidence.
Defense
Mission systems with disciplined evidence
Keep geographically dispersed teams working in one secure environment with the traceability and configuration control defense programs demand.
Railway
Signalling & control to EN 5012x
Manage railway SIL requirements, independent reviews, and verification evidence for control and protection systems under EN 50128 and EN 50129.
Automotive
Functional safety across ASIL A–D
Tie safety goals to requirements, design, and tests with the bidirectional traceability ISO 26262 and Automotive SPICE assessors look for.
Medical Devices
Device software life-cycle control
Structure requirements, risk, verification, and reviews so software life-cycle evidence lines up with IEC 62304 and your quality system.
Industrial Automation
SIL-rated systems, one source of truth
Manage the IEC 61508 safety life cycle and SIL verification evidence for programmable electronic safety systems across the plant.
Space Systems
Flight software you can prove
Bring launch, satellite, and payload software teams into a single traceable environment where every artifact carries its evidence.
UAV & Robotics
Autonomy under assurance
Give autonomous and robotic platforms the same rigorous requirements, review, and verification discipline as crewed systems.
See the workspace your team will live in
A guided look at the screens that carry a program from first requirement to signed evidence. Explore the complete PACT ProSCAPE workflow through real product screenshots, demonstrating requirements management, traceability, reviews, verification, and compliance reporting.

Watch PACT ProSCAPE in motion
A single guided overview of the platform — requirements, traceability, reviews, verification and certification evidence in one place.
Watch an overview of PACT and discover how it simplifies engineering compliance and traceability.
Answers for evaluators
The questions certification, quality, and program leads ask most. Still curious? A demo is the fastest way to see it on your kind of program.
PACT ProSCAPE (Process and Artifact Compliance Tool) is a single web-based environment for managing requirements, reviews, traceability, source, testing, problem reports, and certification evidence for safety-critical programs.
Make certification a byproduct of good process
Bring your requirements, reviews, source, tests, and evidence into one traceable environment. Start with a demo scoped to your program.













